New Builds NEW BUILD 039

Week 15

Click on any of the images below to view in more detail.

The first net drum is winched up 

The first net drum being winched into postition 

Another view of the net drum being lifted 

The first net drum is dropped into position 

The second net drum is attached to the winch 

The second net drum is carefully dropped into position 

The net drum being lowered into its final position 

The net drum being lowered into its final position 

The net drums in thier final position ready to be welded 

A look inside the accommodation sections now in place 

A look inside the accommodation sections in place on 039