New Builds NEW BUILD 042

Week 2

Click on any of the images below to view in more detail.

Starting to build the engine room bulkhead 

Extending the engine room bulkhead 

Frames for the engine bed 

Building the engine bed 

Another view of the engine bed 

Building a bilge tank 

The engine bed is attached to the bulkhead 

The bulkhead is now vertical (with engine bed attached) 

Bilge tanks are added to the sides of the engine bed 

The engine room floor has now been formed 

Work has started on building the keel 

Building the deck over the engine room 

Starting to build the fueltanks