New Builds NEW BUILD 042

Week 20

Click on any of the images below to view in more detail.

The forepeak is ready to be attached above the bulbous bow 

The forepeak has now been lifted into position 

A side view of the forepeak / fo'c'sle 

The side thruster tube is ready to be fitted into the hull 

D-section reinforcing strips have been added around the stern 

A bilge keel has been built on 

The deck sidewall has been added on the port side 

The deck sidewall from on deck 

Some bollards have been fitted to the deck