Sophie Louise II

Project Details

Launched in 2001 at Whitby, her fit out was carried out by the owner K. Dickinson up in Tyneside. With a steel hull construction and a 3/4 aluminium shelter deck, she is powered by Cummins engines.

Yard Number 005
Description 15-metre trawler
Build Year 2001
Flag UK
Construction Steel
Length O/A 14.94 m
Breadth Moulded 5.90 m